top of page
Screen Shot 2017-07-20 at 12.13.41 PM.png

COMPLEXX HISTORY

Complexx Machining, LLC started operations in Wichita, Kansas in 2004 by Owner and President, Godi Daran, an experienced aerospace industry manufacturer with over 30  plus years of aerospace machining experience. What started as a small, high-quality machining operation has since developed into a key element of the aerospace industry.

Over the years the operation has progressively increased capacity and improved operating processes to shape their system into an efficient, value-added production operation.

Complexx Machining believes that all of customers deserve the highest level of service, and is committed to providing that and more. By keeping in tune with new technology and proven machining techniques, Complexx has gained a competitive edge that has contributed to its success as an aerospace supplier.

ISO 9001:2015 AND AS9100D    

Certificate Number: 13022ASR001

ITAR CERTIFIED

REGISTRANT CODE: M25107

SDB (8A) CERTIFIED

certification number:  307662

                                             Terms and Conditions, (2021)

                                             Complexx Machining LLC

The following requirements apply based on the Purchase Order received from Complexx Machining LLC

 

PERSONNEL. Personnel performing special processes must be qualified and/or certified per applicable specifications.

 

SHIPMENT/DELIVERYShipments or deliveries, as specified in a Complexx Machining (Complexx) Purchase Order, shall be in accordance with quantities and schedules. It is recommended that the Supplier notify Complexx of any anticipated delay and make other arrangements. Supplier shall prepare and package product for Complexx to prevent damage and deterioration during shipping.

 

MATERIALS FURNISHED BY ComplexxAll materials furnished by Complexx, including prints, tooling, etc. are to be returned with the product upon completion of the order unless other arrangements have been made.

 

SUBCONTRACTING/APPROVED SUPPLIERS.  Suppliers are requested to be in conformance with AS9100 or equivalent.

Supplier must notify Complexx of any changes to facility location, movement of subcontracted services from one supplier to another and changes in management. Prior to subcontracting, Complexx must be contacted for approval. Suppliers may only use Complexx-approved suppliers. All applicable requirements in the Complexx Purchase Order must be flowed down to the sub-tier suppliers including key characteristics where required. Any Complexx Supplier may subcontract Complexx work to another supplier provided that Complexx is provided with the same rights and protection as contained in the Right of Entry clause.

 

RIGHT OF ACCESS Supplier shall allow Complexx representatives, Complexx customers, and regulatory agencies right of entry into the entire supply chain’s facilities and to all records.

 

QUALITY.  Purchasing information to the supplier will include the applicable revision level of drawings and specifications.  Supplier shall maintain controls and perform all inspections and tests required to substantiate product conformance to requirements.

 

INSPECTION AND TEST EQUIPMENT.  Supplier shall maintain inspection and test equipment to assure calibration traceable to a known national or international standard. Calibration records must be maintained and made accessible to Complexx, if required.

 

FOREIGN OBJECT DAMAGE.   Supplier shall control/prevent foreign object damage or contamination during manufacture, assembly, inspection and/or shipment.

 

RECORDS The Supplier shall maintain records of work performed for Complexx. Records shall include the certificate provided to Complexx as well as all records that substantiate the certificate. These records are to be maintained for a minimum of ten (10) years.

 

NON-CONFORMING MATERIAL.  For material supplied by Complexx, notify Complexx of nonconforming product for disposition.

 

CERTIFICATIONS.  Supplier must provide certificate of conformance that ensures that all requirements of a specification have been met.  Certifications must reflect that all applicable manufacturing and process specifications called for on the engineering drawing have been met. The specifications must be listed on the certification in proper sequence.

 

MATERIALS.  Test reports are required for raw materials.

 

INSPECTIONInspection is to be performed and certified prior to release of product or service.  New production runs on manufactured parts require a First Article Inspection report per AS9102 or similar format if required by Complexx on the Purchase Order. Any other format used must be compliant with AS9102 and approved by Complexx prior to use.

 

CALIBRATION SERVICES ONLY. Calibration of inspection equipment shall be performed traceable to National Institute of Standards and Technology (NIST) or other national or international standards. Certificates of Calibration must be provided.

 

CHANGES.  If supplier makes any changes to its processes that would affect product or service purchased by Complexx, Complexx must be notified prior to the change for approval.

 

                                              If there are any questions, contact:

                                             Godi Daran, President

                                                        Complexx Machining LLC

                                                               (316) 260-3690

MEET OUR TEAM

Screen Shot 2017-07-20 at 1.13.58 PM.png

Godi Daran

President, Owner

Woman with White Shirt

Fadia El-Mansouri

Customer Service Representative

Screen Shot 2017-07-20 at 1.13.58 PM.png

Dennis Stephan

Quality Assurance Manager

IMG_2424.jpg

Web Design, Social Media Marketing Intern

bottom of page